Rapid 350m² Flat Roof Refurbishment

Warren Wood School

Warren Wood School was facing the common headache of an aging flat roof: recurring leaks and degrading insulation that threatened to disrupt the learning environment. With a total area of 350m², the school needed a solution that was cost-effective and durable, but most importantly, fast. Traditional “strip and replace” methods would have taken too long and risked exposing the building to the elements during the school term.

Curabitur non nulla sit amet nisl tempus.

The Solution: Siltec Torch-On Overlay

Our team specified the Siltec Torch-On Overlay System. This was the strategic choice for several reasons:

· Efficiency: By overlaying the existing sound structure, we eliminated the need for a time-consuming and messy tear-off.

· Longevity: The Siltec system provides a robust, multi-layer waterproof barrier, effectively adding 20 years of guaranteed life to the roof.

· Performance: It offers excellent thermal stability and resistance to the typical “wear and tear” of a busy school building.

Curabitur non nulla sit amet nisl tempus.

The Results

Efficiency was the headline of this project. While a refurbishment of this scale typically takes significantly longer, our specialized crews completed the entire 350m² install in just 2 weeks.

· Minimized Disruption: The rapid turnaround meant zero downtime for the school’s staff and students.

· Budget-Friendly: By choosing an overlay system, the school saved on labor and waste disposal costs without compromising on quality.

· Future-Proofed: The school now has two decades of peace of mind with a fully warranted, high-performance roof.

Extended Life

25+

20 Years

Roof Size

25+

350m²

System Used

25+

Siltec Torch-On Overlay

Timescale

25+

2 Weeks (Approx.)