Case Studies
01
Blacksole Farm, Herne Bay
We deployed a dedicated site team to manage the 7-month build cycle. The choice of Thrutone Textured Slates provided the aesthetic of natural slate with the lightweight, uniform performance required for modern timber-frame and masonry builds.
02
Rochester Cathedral
Because of the building’s protected status, “off-the-shelf” materials were not an option.
Our team focused on two key areas:
· Sourcing Authenticity
· Specialist Repairs
03
Warren Wood School
Warren Wood School was facing the common headache of an aging flat roof: recurring leaks and degrading insulation that threatened to disrupt the learning environment. With a total area of 350m², the school needed a solution that was cost-effective and durable, but most importantly, fast.
